Layout of the track
 
Construction of buildings explained.
Trackīs physical characteristics:
-2 Lanes
-Analog system.
-The track was built on MDF boards (9mm thick) and the slots were routed to a depth of 6mm and 3.3mm wide. The overal track length is about 26.0m long. (need confirmation)
-Contact:Copper tape
-Number of turns: 24

Track covering:
The track has at least 3 main surfaces: Asphalt, snow and dirt. One great bridge awaits drivers at the montainous section and in the village centre two crossroads increase the challenge. Leaving the village  section one bumby flyover bridge will toss your cars off the track if you exceed your speed.

Racing features:
-Detection of cars: 4 LDR (Light Dependent Resistor). Lap counter, Fuel management.
-Port and Software: LPT1, Ultimate Racer 3.0
-Two independent power sources so one lane doesnīt interfere to the other.Two Carrera power sources (14v).
-Direction switch so cars can travel in different directions.

Home
Categories
 
Logbook
Contact me
Favourite Links
Sub categories
 
See also:
 
 
Guestbook
 
All photographs shown on this web site are property of Leonardo Cerante.
 
 
Best viewed: 1024x768 res
Page designed and published by Leonardo Cerante
Home      
 
 
 
 
Scale 1:32
Model-Land Rally Project
 
Site Under Construction / In Aanbouw
Track layout
Material list
Car setups
Electronics
Cars
Photo gallery
*THE CONSTRUCTION*
Who is Leonardo?
This crude drawing displayed here is a plan of the layout of my track. You can check the scale of 1m I have placed in the lower left of the paper. I know this figure isnīt clear enough for a complete analisys because itīs missing the gradation scale for elevations and slopes. At least you can check the basic course the cars may be travelling soon. You can notice the two yellow squares, these are crossings that will be placed in the middle of the village.The little squares and rectangles represent the buildings of this village (A). On the upper left (B) there will be the montainous part of the circuit and it may be about 40 to 50cm higher than the village level .There will be two stone bridges on the mountain and.this part is going to be covered with snow. At (C) is the downslope which will be very tight and cars wonīt be travelling side by side here. This is another tight passage (D); cars will cross the village in its most narrow alley. After that they will enter a tunnel which wonīt be entirely covered, then make a curve, get past two crossings and pass by the barbican building then return to the mountains again passing over a flyover bridge(E).
A
B
C
D
E
BRIDGE
Đ Barkshire Model Land Project, 2009, 2010 all rights reserved . Leonardo Cerante.
Fastest lap: 16.930s
Car: Peugeot 307 WRC Scalextric

This section is under maintenance
Thanks for voting on my last poll. Here is the result.

What do you think about the layout of my track?

    Answers                 Votes     Percent
       
1.Perfect                      22        67%
       
2.Very good                  8         24%
       
3.Too fancy, but ok.       3          9%
       
4.It wont work                0          0%

Your oppinion on how looked my layout made me believe it was good enough to be built. Some good friends around the world even told me it was an "elegant" layout. Thank you all who helped me taking this step forward!!
A new question awaits your vote!!
Feedback Poll
 
Scenery